Categorical Exclusion Determinations: B1.3

Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission LinesCX(s) Applied: B1.3Date: 06/25/2010Location(s): Lane County, OregonOffice(s): Bonneville Power Administration
Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line CorridorCX(s) Applied: B1.3Date: 06/25/2010Location(s): Hood River County, OregonOffice(s): Bonneville Power Administration
272-AW Building Renovation Project, Hanford SiteCX(s) Applied: B1.15, B1.22, B2.1, B1.3Date: 06/23/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Repairs to Men?s Bathroom in West Hackberry Building 302CX(s) Applied: B1.3Date: 06/21/2010Location(s): West Hackberry, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Maintenance of and Improvements to the Access Roads from Structure 53/3 through 66/3 of the Fairview-Rogue Number 1 Transmission Line CorridorCX(s) Applied: B1.3Date: 06/21/2010Location(s): Curry County, OregonOffice(s): Bonneville Power Administration
Repair 70 Ton Cask Lid Support Superstructure, L AreaCX(s) Applied: B1.3Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Repair Storm Water Drainage Outside the T-Area CapCX(s) Applied: B1.3Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office