Categorical Exclusion Determinations: B1.3

Purchase and Install Defense Waste Processing Facility Melter BubblersCX(s) Applied: B1.3Date: 04/28/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Bubbler Upgrade Support - Defense Waste Processing Facility Dry Frit AdditionCX(s) Applied: B1.3Date: 04/28/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Bubbler Upgrade Support - Defense Waste Processing Facility Water Separation from Decon Frit SolutionCX(s) Applied: B1.3Date: 04/28/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
C-Farm Electrical, Lighting, and Walkway UpgradesCX(s) Applied: B1.13, B2.1, B1.3Date: 04/27/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Spacer replacement along the Hanford-Wautoma #1 and #2 (substation to substation) transmission linesCX(s) Applied: B1.3Date: 04/23/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration
Kittitas County, Washington Morris Sorensen Building and Upper County Shop - Energy Efficiency and Conservation Block Grant State of WashingtonCX(s) Applied: B1.3, B5.1Date: 04/22/2010Location(s): Kittitas County, WashingtonOffice(s): Energy Efficiency...
Washington Cowlitz County Partnership Project - Energy Efficiency and Conservation Block Grant State of WashingtonCX(s) Applied: B1.3, B5.1Date: 04/22/2010Location(s): Cowlitz County, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden ...
Replace Spacer Dampers Along the Grizzly - Captain Jack No. 1 500 Kilovolt Transmission LineCX(s) Applied: B1.3Date: 04/21/2010Location(s): Crook County, OregonOffice(s): Bonneville Power Administration
Control House Seismic Upgrades - Allston, Keeler, Ostrander, and Marion SubstationsCX(s) Applied: B1.16, B1.3Date: 04/12/2010Location(s): Columbia, OregonOffice(s): Bonneville Power Administration