Categorical Exclusion Determinations: B1.3

SGT Refurbishment Process Relocation from Kansas City Plant (KCP) to Kirtland Operations (KO)CX(s) Applied: B1.16, B1.31, A7, B1.3Date: 04/12/2010Location(s): MissouriOffice(s): Kansas City Site Office, NNSA-Headquarters
Replace Defense Waste Processing Facility Argon TankCX(s) Applied: B1.3Date: 04/07/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Building 33 Chemical Resistant Flooring ProjectCX(s) Applied: B1.3Date: 04/07/2010Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
Re-seal Polyurethane Overcoat on BH Substation Relay Building 814CX(s) Applied: B1.3Date: 04/07/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing BridgeCX(s) Applied: B1.13, B1.3Date: 03/31/2010Location(s): Spokane County, WashingtonOffice(s): Bonneville Power Administration
The Winooski, Vermont Community CenterCX(s) Applied: B2.1, B2.5, B1.3, B5.1Date: 03/31/2010Location(s): Winooski, VermontOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory