Categorical Exclusion Determinations: Office of Petroleum Reserves

Strategic Petroleum Reserve Grass Cutters & Ground Maintenance Personnel, 2015-2019 (Multiple) CX(s) Applied: B1.3Date: 03/15/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Inspection and Repair of West Hackberry-Sun 42-Inch Crude Oil Pipeline CX(s) Applied: 0Date: 02/18/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Miscellaneous Pump Maintenance Parts, 2016-2020 (Multiple) CX(s) Applied: B1.3Date: 02/10/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
West Hackberry Rework 42-inch Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3Date: 01/29/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Inspection and Repair of West Hackberry-LCMS 36-Inch Crude Oil Pipeline CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Section of Bryan Hill 36-Inch Crude Oil Pipeline at Hillebrandt Bayou CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - GFE (BM-MM-1203A) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office