Inspection and Repair of West Hackberry-Sun 42-Inch Crude Oil Pipeline CX(s) Applied: 0Date: 02/18/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
February 18, 2016Inspection and Repair of West Hackberry-Sun 42-Inch Crude Oil Pipeline
CX(s) Applied: 0
Date: 02/18/2016
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to excavate, inspect and repair two external corrosion anomalies on the WH-Sun 42-inch crude oil pipeline. Tasks include excavation and backfilling, cleaning and examination, UT testing, repairs, welding, and hydrostatic testing. Work is located in wetlands. A consistency determination and programmatic general permit is required prior to commencement of construction.