Categorical Exclusion Determinations: Office of Petroleum Reserves

Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805) CX(s) Applied: B1.3Date: 08/31/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423 CX(s) Applied: B1.4Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area CX(s) Applied: B1.3Date: 07/17/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office