Categorical Exclusion Determinations: B4.6

The 34.5kV line will be rebuilt from the Attica interconnection meter to the substation which will include new oles, conductors, insulators, transf…
Bonneville Power Administration (BPA) proposes to re-conductor the Glade 115kV Tap serving Franklin County PUD (FCPUD) and Big Bend Electric Coop (…