CX-031495: Glade-Tap Reconductor

Bonneville Power Administration (BPA) proposes to re-conductor the Glade 115kV Tap serving Franklin County PUD (FCPUD) and Big Bend Electric Coop (…

Office of NEPA Policy and Compliance

July 29, 2024
minute read time

Bonneville Power Administration (BPA) proposes to re-conductor the Glade 115kV Tap serving Franklin County PUD (FCPUD) and Big Bend Electric Coop (BBEC) at Glade Substation located in Franklin County, WA as well as replace the disconnect structures within and outside the substation.