CX-031932: 34.5 feeder line

The 34.5kV line will be rebuilt from the Attica interconnection meter to the substation which will include new oles, conductors, insulators, transf…

Office of NEPA Policy and Compliance

August 23, 2024
minute read time

The 34.5kV line will be rebuilt from the Attica interconnection meter to the substation which will include new oles, conductors, insulators, transformers, and other necessary components.