Categorical Exclusion Determinations: Texas

Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon CX(s) Applied: A9, B3.1 Date: 11/01/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Temporal Characterization of Hydrates System Dynamics Beneath Seafloor Mounds: Integrating Time-Lapse CX(s) Applied: B3.6 Date: 10/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Temporal Characterization of Hydrates System Dynamics beneath Seafloor Mounds: Integrating Time-Lapse CX(s) Applied: A9, A11 Date: 10/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Gas Hydrate Dynamics on the Alaskan Beaufort Continental Slope: Modeling and Field Characterization CX(s) Applied: A9 Date: 09/27/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory