Categorical Exclusion Determinations: Savannah River Operations Office

The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system. The building was last upgraded in 1994.…
701-2K is currently on The Electronic Safeguards and Security System (E3S) and operating beyond its intended lifetime. K-Area Facility is funding A…
R and D for the development of uranium chalcogenides crystal growth with rad samples. The crystals grown in this lab will be using chemical vapor t…
Lab modules C-142/146 and D-1169 are being renovated to house a new mission, Crystal Growth Lab for Nuclear Detection. The Crystal Growth Lab will …