The proposed activity is to isolate the discharge pathway (Manhole P34) of industrial wastewater generated in F-Area Complex (FAC) from the 281-5F …
Office of NEPA Policy and Compliance
January 30, 2024The proposed activity is to isolate the discharge pathway (Manhole P34) of industrial wastewater generated in F-Area Complex (FAC) from the 281-5F basin to the storm sewer that eventually discharges to the FM-3 outfall.