Categorical Exclusion Determinations: Savannah River Operations Office

Install Purge Water Management Unit(s) at Chemicals, Metals, and Pesticides Pits Monitoring Well(s) CX(s) Applied: B6.9 Date: 12/13/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Groundwater Monitoring Well North of S-Area for Z-Area Monitoring CX(s) Applied: B3.1 Date: 12/13/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install an Alternate Air Purge for the Phase II Receipt Tanks (JT-71/7) CX(s) Applied: B2.5 Date: 12/08/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of a Two 3-megavolt Ampere Reactive Capacitor Banks on a New Concrete Pad in A-Area CX(s) Applied: B1.7 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Domestic Water to River Water Cross Connection for the Biomass Cogeneration Facility CX(s) Applied: B2.5 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office