Categorical Exclusion Determinations: Savannah River Operations Office

Construction of Parking and Laydown Areas in the Vicinity of Pads 717-14F, 263-95F, and 249-F. CX(s) Applied: B1.15 Date: 01/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
735-A Laboratory D137 Microscopy and Spectroscopy Research and Development CX(s) Applied: B3.6 Date: 01/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit Salt Batch Qualification CX(s) Applied: B3.6 Date: 01/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office