BPA proposes to sell the BPA Mountain Avenue Substation to the City of Ashland. The proposed activity would be to sell the BPA substation and the associated fee-owned substation property to the city. The City of Ashland would then operate the substation. BPA would retain easements for the substation including the tap line into the substation.
Bonneville Power Administration (BPA) proposes to replace the wood pole structures located at 9/5 and 11/6 on the Martin Creek-Drain No.1 transmission line. During inspection, these two structures were found to have substantial defects that could result in risk to human safety and system reliability, and must be replaced.