Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical compon…
Office of NEPA Policy and Compliance
September 1, 2022Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical components (i.e., cross arms, insulators, guy and guy anchors, etc.) located at 27/5 of the 230-kV Maupin-Redmond No.1 high-voltage transmission line in central Oregon.