Categorical Exclusion Determinations: Hanford Field Office

Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011CX(s) Applied: B1.3Date: 06/28/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Safety and Environmental Improvements of a Facility, and Replacement/Upgrade of Facility ComponentsCX(s) Applied: B2.5Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Siting, Construction and Operation of Support Buildings and Support StructuresCX(s) Applied: B1.15Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Outdoor Tests, Experiments on Materials and Equipment ComponentsCX(s) Applied: B3.11Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Indoor Bench-Scale Research Projects and Conventional Laboratory OperationsCX(s) Applied: B3.6Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Outdoor Tests, Experiments on Materials and Equipment ComponentsCX(s) Applied: B3.11Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical FacilitiesCX(s) Applied: B3.12Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office