An official website of the United States government
Here's how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock (
) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Categorical Exclusion Determinations: Hanford Field Office
Nesting Bird Deterrent Study at the 241-C Tank Farm CX(s) Applied: B3.8 Date: 07/26/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Mission Support Alliance Shutdown of Waste Sampling and Characterization Facility CX(s) Applied: B1.28 Date: 04/10/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Project S-234, Patrol Training Academy Firing Range Realignment CX(s) Applied: B1.15 Date: 03/28/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Explosives Research Capability Expansion, 300 Area, Hanford Site CX(s) Applied: B3.6 Date: 02/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.22 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.17 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 CX(s) Applied: B1.16 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.6 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B3.11 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office