Categorical Exclusion Determinations: B2.5

Install an Alternate Air Purge for the Phase II Receipt Tanks (JT-71/7) CX(s) Applied: B2.5 Date: 12/08/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Domestic Water to River Water Cross Connection for the Biomass Cogeneration Facility CX(s) Applied: B2.5 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Massachusetts-TRIBE-MASHPEE WAMPANOAG TRIBAL COUNCIL INC. CX(s) Applied: B2.5, A9, B5.1, B5.16 Date: 11/22/2011 Location(s): Massachusetts Offices(s): Energy Efficiency and Renewable Energy