Categorical Exclusion Determinations: B2.1

B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement CX(s) Applied: B1.4, B2.1, B2.2, B2.5 Date: 04/16/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8 CX(s) Applied: B2.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Energy Efficiency and Conservation Block Grant- City Hall Heating and Cooling CX(s) Applied: A9, A11, B1.32, B1.35, B2.1, B2.2, B5.1 Date: 01/24/2013 Location(s): North Dakota Offices(s): Golden Field Office
Washington River Protection Solutions LLC - Workplace Enhancements CX(s) Applied: B2.1 Date: 12/18/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office