Categorical Exclusion Determinations: B2.1

Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office CX(s) Applied: B2.1 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Municipal Building Geothermal and Heating, Ventilation and Air Conditioning- City of Oregon, Ohio CX(s) Applied: A9, B2.1, B5.19 Date: 06/18/2013 Location(s): Ohio Offices(s): Golden Field Office
State Energy Program- Program Year 2013- Formula Award CX(s) Applied: A9, A11, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19 Date: 05/09/2013 Location(s): CX: none Offices(s): Golden Field Office