Categorical Exclusion Determinations: B1.3

Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s...
Flaming Gorge - Vernal 138 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/21/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Access Road Improvement For the Kalispell-Kerr Number 1, 115-kilovolt (kV) Transmission Line CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Site-Wide Painting Project at National Energy Technology Laboratory CX(s) Applied: B1.3 Date: 09/17/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration