Categorical Exclusion Determinations: B1.3

Central Training Facility and Office of Secure Transportation Fence Line Maintenance CX(s) Applied: B1.3, B1.11 Date: 11/05/2012 Location(s): Tennessee Offices(s): Oak Ridge Office
Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions CX(s) Applied: B1.3, B1.19, B5.16 Date: 11/02/2012 Location(s): Arizona Offices(s): Legacy Management
Artesia-Rangely Tap of the Hayden-Vernal 138 Kilovolt Transmission Line Bank Stabilization on Structure 20/2 CX(s) Applied: B1.3 Date: 10/29/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration