Categorical Exclusion Determinations: B1.3

Replace River Water Pelton Valves if Necessary and Remove Existing Valve Houses CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install West Hackberry Crude Oil Pipeline Temperature Monitoring System (WH-MM-784) CX(s) Applied: B1.3Date: 11/19/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106) CX(s) Applied: B1.3Date: 11/04/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office