Categorical Exclusion Determinations: B1.3

Inspection and Repair of West Hackberry-LCMS 36-Inch Crude Oil Pipeline CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Section of Bryan Hill 36-Inch Crude Oil Pipeline at Hillebrandt Bayou CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - GFE (BM-MM-1203A) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office