DOE/EIS-0270: Final Environmental Impact Statement (March 1999)

Final DOE/EIS-0270 (March 1999) for accelerator production of tritium at the Savannah River Site.

Office of NEPA Policy and Compliance

March 12, 1999
minute read time

Accelerator Production of Tritium at the Savannah River Site

DOE issued Final Accelerator Production of Tritium at the Savannah River Site (DOE/EIS-0270), which evaluates the potential environmental impacts of alternatives for siting, constructing, and operating an accelerator for tritium production at the Savannah River Site. The final EIS contains a summary, lists changes to the draft EIS, and provides responses to comments. It incorporates the draft EIS.

For more information, see Accelerator Production of Tritium at the Savannah River Site