Categorical Exclusion Determination
Office of NEPA Policy and Compliance
June 18, 2018Bonneville Power Administration proposes to repair approximately 10.5 miles of access road along the first 28 miles of the Toledo-Wendson transmission line. Proposed road work would include; blading, shaping, grading, brushing, and placing surface rock on new and existing road prisms to ensure safe access to structures.