Checklist provides federal site managers with a series of tasks and questions to ask their utility, broken out by each interconnection process step.
Federal Energy Management Program
September 7, 2021Checklist provides federal site managers with a series of tasks and questions to ask their utility, broken out by each interconnection process step. These checklist items are applicable to most types and sizes of distributed energy regardless of implementation method.
Agencies may also wish to download the Battery Energy Storage System Procurement Checklist to assist in the early stages of battery energy storage systems project development.
Hover over the topic headings and checklist items in the document to compress the checklist descriptions into a consolidated list.
Additional Resources
Agencies are encouraged to utilize Federal Energy Management Program (FEMP) technical specification resources and relevant checklists in developing their microgrid project.
Technical Specifications from FEMP
- Technical Specifications for On-site Solar Photovoltaic Systems
- Lithium-ion Battery Storage Technical Specifications
- Technical Specifications for On-site Wind Turbine Installations
- Geothermal Heat Pump System Technical Specifications
Distributed Energy Checklists from FEMP
Need Assistance?
For assistance customizing these specifications to your project's needs, please reach out through the FEMP Technical Assistance Portal.