Tank Waste

Hanford Crew Completes Key First Test of 'Bubblers'
The Hanford Waste Treatment and Immobilization Plant becomes operational and is transforming radiological and chemical tank waste into immobilized glass, a team will periodically replace various parts of the treatment system during routine maintenance.
Workers with tank operations contractor Washington River Protection Solutions connect hoses to an ion exchange column inside the Tank-Side Cesium Removal System’s process enclosure before processing another batch of tank waste at the Hanford Site.
EM Office of River Protection (ORP) tank operations contractor Washington River Protection Solutions (WRPS) recently resumed processing high-level tank waste through the Tank-Side Cesium Removal System at the Hanford Site following a maintenance outage.
A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.
A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.
Hanford Crews Qualified for Melter Heatup
Four of five crews of operations staff, including Commissioning Technician Gwendy Watkins, pictured here, at the Hanford Waste Treatment and Immobilization Plant are now fully qualified in their “watch stations”.