Science & Technology News

Workers with contractor Washington River Protection Solutions performed additional maintenance and repairs inside the Tank-Side Cesium Removal System during a planned outage before resuming treatment of tank waste at the Hanford Site.
The EM Office of River Protection (ORP) and contractor Washington River Protection Solutions (WRPS) have resumed processing tank waste through the Tank-Side Cesium Removal (TSCR) System at the Hanford Site following a second, planned maintenance outage.