CX-030405: Abandonment of Recovery Well M-Area (RWM) 1

Recovery well RWM 1 is connected to the M-1 Air Stripper and removed volatile organic compound contaminated groundwater from the M-Area Aquifer Zon…

Office of NEPA Policy and Compliance

March 14, 2024
minute read time

Recovery well RWM 1 is connected to the M-1 Air Stripper and removed volatile organic compound contaminated groundwater from the M-Area Aquifer Zone and Lost Lake Aquifer Zone. Due to a reduction in flow rate, an environmental drilling subcontractor will abandon RWM 1.