Recovery well RWM 1 is connected to the M-1 Air Stripper and removed volatile organic compound contaminated groundwater from the M-Area Aquifer Zon…
Office of NEPA Policy and Compliance
March 14, 2024Recovery well RWM 1 is connected to the M-1 Air Stripper and removed volatile organic compound contaminated groundwater from the M-Area Aquifer Zone and Lost Lake Aquifer Zone. Due to a reduction in flow rate, an environmental drilling subcontractor will abandon RWM 1.