CX-030256: Domestic water supply loop feed at grid computing center

The purpose of this project is to install approximately 1400 LF of 4" PVC domestic water supply (DWS) pipe feed into the existing 6" DWS pipe runni…

Office of NEPA Policy and Compliance

March 26, 2024
minute read time

The purpose of this project is to install approximately 1400 LF of 4" PVC domestic water supply (DWS) pipe feed into the existing 6" DWS pipe running along the north side of Batavia Road, east of Site 50.