CX-026808: Road 4 Milling, Paving, and Striping

Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road…

Office of NEPA Policy and Compliance

August 7, 2022
minute read time

Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road dressed with top soil and grassing.