Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road…
Office of NEPA Policy and Compliance
August 7, 2022Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road dressed with top soil and grassing.