CX-270580: No. 4 BOILER REPLACEMENT, CONDENSATE RETURN TANK REPLACEMENT, BUILDING 8 SIDING ABATEMENT AND REPLACEMENT, AND THE BUILDING 8 CONTROL ROOM RELOCATION

This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste

Office of NEPA Policy and Compliance

September 24, 2020
minute read time

This project replaces the existing, retired No. 4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-systems to provide optimal operation and steam generation capacity at KS.
 

CX-270580.pdf (1.67 MB)