This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
Office of NEPA Policy and Compliance
September 24, 2020This project replaces the existing, retired No. 4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-systems to provide optimal operation and steam generation capacity at KS.