CX-021022: Parker - Bouse: 2019 Integrated Vegetation Management

The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…

Office of NEPA Policy and Compliance

November 21, 2019
minute read time

The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along the Parker (PAD) to Bouse (BSE) transmission line segment (approx. 23 miles).