The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
Office of NEPA Policy and Compliance
November 21, 2019The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along the Parker (PAD) to Bouse (BSE) transmission line segment (approx. 23 miles).