Categorical Exclusion Determination
Office of NEPA Policy and Compliance
January 7, 2019The Western Area Power Administration is proposing to replace the existing sewer line, drain line, toilet, urinal, and exterior hose bib at the Glen Canyon Control Building. All work would occur at the control building. Proposed work would occur sometime during calendar year 2019.