CX-019278: Glen Canyon Substation: Bathroom Repairs

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

January 7, 2019
minute read time

The Western Area Power Administration is proposing to replace the existing sewer line, drain line, toilet, urinal, and exterior hose bib at the Glen Canyon Control Building. All work would occur at the control building. Proposed work would occur sometime during calendar year 2019. 

CX-019278.pdf (174.38 KB)