CX-270521: S8G Refueling Overhaul Infrastructure Project

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

July 1, 2014
minute read time

The scope of the S8G ROH Infrastructure Project includes installation of a pre-assembled self-contained building that will house a diesel powered water pump, diesel fuel storage tank, and other associated equipment that will be used to support the fire protection needs for future facilities.

KS_S8G_ROH.pdf (97.56 KB)