Categorical Exclusion Determination
Office of NEPA Policy and Compliance
July 1, 2014The scope of the S8G ROH Infrastructure Project includes installation of a pre-assembled self-contained building that will house a diesel powered water pump, diesel fuel storage tank, and other associated equipment that will be used to support the fire protection needs for future facilities.