Categorical Exclusion Determination
Office of NEPA Policy and Compliance
September 7, 2018Bonneville Power Administration proposes to perform routine road maintenance, repair, and improvements on the John Day-Marion Access Road. The proposed work is necessary to maintain or repair existing infrastructure and roadway safety. The proposed project includes the following features:
• Existing access road improvements (27,200 linear feet);
• Existing access roads reconstruction (4,900 lineal feet);
• Mowing on road prism (19,300 lineal feet).