CX-018786: John Day-Marion Number 1 Transmission Line, Access Road Maintenance

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

September 7, 2018
minute read time

Bonneville Power Administration proposes to perform routine road maintenance, repair, and improvements on the John Day-Marion Access Road. The proposed work is necessary to maintain or repair existing infrastructure and roadway safety. The proposed project includes the following features:
• Existing access road improvements (27,200 linear feet);
• Existing access roads reconstruction (4,900 lineal feet);
• Mowing on road prism (19,300 lineal feet).