CX-018673: Upgrade Wood to Steel Lighting Poles

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 27, 2018
minute read time

The contractor shall provide all materials, tools, equipment, supplies, hardware, transportation, facilities, labor, supervision and services required to safely and successfully install three metal light poles with concrete foundations with two light fixtures on each pole. The contractor will also remove three existing sunk-in-grade wood light poles at the Department of Energy’s federal crude oil reserve site located at Bryan Mound.