Categorical Exclusion Determination
Office of NEPA Policy and Compliance
August 27, 2018The contractor shall provide all materials, tools, equipment, supplies, hardware, transportation, facilities, labor, supervision and services required to safely and successfully install three metal light poles with concrete foundations with two light fixtures on each pole. The contractor will also remove three existing sunk-in-grade wood light poles at the Department of Energy’s federal crude oil reserve site located at Bryan Mound.