Categorical Exclusion Determinations: Wisconsin

Combined PV/Battery Grid Integration with High Frequency Magnetics Enabled Power CX(s) Applied: B5.15Date: 03/03/2016 Location(s): WisconsinOffices(s): National Energy Technology Laboratory
Combined Photovoltaic/Battery Grid Integration with High Frequency Magnetics Enabled Power CX(s) Applied: B5.15Date: 03/03/2016 Location(s): WisconsinOffices(s): National Energy Technology Laboratory
Demonstration of uCHP in Light Commercial Hot Water Applications Award Number: DE-EE0006796 CX(s) Applied: A9, B2.1, B5.1 Buildings Technologies Office Date: 09/11/2014 Location(s): WI Office(s): Golden Field Office
POROELASTIC TOMOGRAPHY BY ADJOINT INVERSE MODELING OF DATA Award Number: DE-EE0006760 CX(s) Applied: A9 Geothermal Technologies Office Date: 09/11/2014 Location(s): WI Office(s): Golden Field Office
Poroelastic Tomography by Adjoint Inverse Modeling of Data Award Number: DE-EE0006760 CX(s) Applied: B3.1 Geothermal Technologies Office Date: 01/28/2016 Location(s): WI Office(s): Golden Field Office
Advanced Supercritical Carbon Dioxide Cycles Award Number: DE-EE0007120 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 08/13/2015 Location(s): WI Office(s): Golden Field Office
Energy Efficiency Equipment in Dairy Processing Plant Award Number: DE-EE0000163 CX(s) Applied: B5.1 State Energy Program Date: 08/11/2015 Location(s): WI Office(s): Golden Field Office
Location, Location, Efficiency! (Milwaukee, WI) Award Number: DE-EE0007069 CX(s) Applied: A9, A11 Building Technologies Office Date: 06/12/2015 Location(s): WI Office(s): Golden Field Office
Accelerate Performance: Driving Demand For Proven Energy Performance Award Number: DE-EE0007068 CX(s) Applied: A9 Building Technologies Office Date: 06/11/2015 Location(s): WI Office(s): Golden Field Office