Categorical Exclusion Determinations: South Dakota

Rapid City Substation Dry Creek Substation Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Construction of the Rapid City-Dry 115 kilovolt Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
The Geotechnical Investigation of the Long Baseline Neutrino Experiment Detector Site in South Dakota CX(s) Applied: B3.1 Date: 03/27/2013 Location(s): South Dakota Offices(s): Fermi Site Office
Developing Gas Stripping, Catalytic Fast Pyrolysis Conversion of Corn Stover to Drop-in Quality Hydrocarbons CX(s) Applied: A9, B3.6 Date: 05/09/2013 Location(s): South Dakota Offices(s): Golden Field Office