Categorical Exclusion Determinations: Savannah River Operations Office

HVAC No. 2 for 211-8H Control Room is being replaced with a new (like for like) unit (WO No.2009200). Replacement will include replacing existing n…
This EEC will cover the repair of HB-Line exterior wall near the roof drainpipes to restore the damaged concrete to the original design capacity, t…
Subcontractor will repair 766-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 766-H.…